docs / scope / scope-of-work
Scope of Work Builder
The Scope of Work Builder is where you build, price and lock a property's rehab budget. You can describe repairs and have rei.OS propose priced lines from your Cost Library, add lines by hand, or import a scope from Excel, CSV, PDF or a pasted list. Locking runs a verification checklist, makes the line items read-only, files the Scope of Work to the property and turns on the branded SOW PDF export and change orders.
- Where
- Open a property and go to the Scope of Work tab. The builder has the tabs Line Items, Library, Import / Export and Walkthrough (Soon).
- Before you start
- Add the property to rei.OS.
- For AI pricing, fill in your Cost Library in the Library tab with your material and labor rates.
Start a scope with the AI Scope Builder
- 1Open the property's Scope of Work tab and stay on Line Items.
- 2In the AI Scope Builder, pick a starting point: Room by room, Category by category, or From a walkthrough (paste notes or an inspection summary). Or just describe a repair.
- 3Click Propose. rei.OS looks up your Cost Library rates and may ask clarifying questions.
- 4Review the batch marked 'Proposed · not in your scope yet'. Click Accept on a line, or Accept all to add every priced line.
- 5For lines marked 'No rate in your Cost Library', enter a material and/or labor rate and click Set rate & add.
- 6For lines with only an estimated labor number, enter a labor number and click Confirm labor & add, or click Add · labor to bid.
- 7Click Reject on anything you don't want. Nothing enters your scope until you accept it.
Add or edit line items by hand
- 1Type the item in the AI Scope Builder box and click Add line. It's filed as an unpriced item for you to price.
- 2Or, on an empty scope, click Add first line item.
- 3Edit quantity, unit, material and labor in the line-item table.
- 4Use the category rail to show one category at a time.
Import a scope from Excel, a PDF or a list
- 1Go to Import / Export, then Import.
- 2Paste rows from Excel, a lender template or a bulleted list into the paste box, then click Parse with AI.
- 3Or click Upload file and choose an Excel, CSV, PDF, text or image file.
- 4Review and edit the parsed lines in the table.
- 5Click Add N to scope. Imported lines work the same as lines you add by hand.
Resolve a deviation flag
- 1In Line Items, find the line with a deviation flag. The tab bar shows how many flags are open.
- 2On the flag card, choose Accept with note, Save as new library item, or Reprice.
- 3Repeat until no flags are open. Open flags block locking.
Lock the Scope of Work
- 1Make sure the scope has at least one line and no open deviation flags. Until then, Submit & lock in the Scope of Work header is greyed out.
- 2Click Submit & lock. The LOCK SCOPE OF WORK window opens.
- 3Work through the Verification checklist: Every line has a cost source, Every AI / Photo line reviewed, Every line has a rate, No labor awaiting bid, Contingency set, Totals reconcile. If a check fails, the lines causing it are named so you can fix them in Line Items.
- 4Tick each check, tick the attestation box and type LOCK SCOPE.
- 5Click Submit & lock. You'll see 'Scope locked', line items become read-only, and the Scope of Work is filed to the property.
Export the SOW as a PDF
- 1Lock the scope first. Export isn't available while the scope is a draft.
- 2Go to Import / Export, then Export.
- 3Click Export rei.OS SOW.
- 4The branded PDF is filed to the property's Documents. Click Open last export to view it.
Add a change order after locking
- 1After the scope is locked, scroll to Change orders below the builder.
- 2Click New change order.
- 3Enter a Name and a Reason, and optional Notes.
- 4Add one or more lines with category, description, quantity, unit, material and labor.
- 5Click Create change order. It's filed as CO-001, CO-002 and so on, and appears in the Change Order Ledger with its reason, date, amount and a running adjusted total.
- 6To schedule the new work, open the property's Project Manager tab, then Timeline. Change order lines arrive under Unscheduled, where you click one to set a start date, duration and assignee.
Questions
How do I build a scope of work in rei.OS?
Open the property's Scope of Work tab, describe repairs in the AI Scope Builder and click Propose, then accept the priced lines you want. You can also add lines by hand or import a scope from Excel or a PDF.
Does the AI add items to my scope automatically?
No. Proposed lines stay under 'Proposed · not in your scope yet' until you click Accept or Accept all.
Where do the AI's prices come from?
Propose uses the material and labor rates in your Cost Library, which you manage in the Library tab. Lines with no matching rate are marked 'No rate in your Cost Library' so you can enter your own.
How do I import a lender or contractor scope into rei.OS?
Go to Import / Export, then Import. Paste the rows and click Parse with AI, or click Upload file for Excel, CSV, PDF, text or an image. Review the parsed lines, then click Add N to scope.
How do I clear a deviation flag?
On the flagged line in Line Items, choose Accept with note, Save as new library item, or Reprice. Every flag must be resolved before you can lock.
Why can't I lock my scope of work?
Submit & lock stays greyed out until the scope has at least one line and no open deviation flags. In the lock window, every checklist item must pass: each line has a cost source and a rate, every AI or photo line is reviewed, no labor is awaiting a bid, contingency is set, and totals reconcile. Lines with no rate must be priced, marked as an allowance or removed. You also tick the attestation and type LOCK SCOPE.
Can I unlock a scope after I lock it?
No. There's no unlock button. After locking, line items are read-only and every change goes through a change order.
How do I change the budget after the scope is locked?
Click New change order under Change orders. Each change order counts toward the adjusted total in the Change Order Ledger as soon as you create it. The original locked scope never changes.
Do change orders need to be approved in rei.OS?
No. There's no approval step for a change order. It counts toward the adjusted total as soon as you click Create change order.
Can my lender approve the scope inside rei.OS?
No. There's no lender approval step. You lock the scope yourself, then use Export rei.OS SOW to create a PDF you can send to your lender.
Why is SOW export locked?
The PDF is always built from the locked scope, so it matches exactly what you locked. Lock the scope to turn on Export rei.OS SOW. Change orders appear in a Change Order Addendum in the PDF.
Do I need to click Save in the Scope of Work Builder?
No. It saves automatically, and the header shows when it last saved, for example 'Saved just now'. If a save fails, a Not saved button appears. Click it to try again.
Limits
- After locking, line items are read-only and there's no way to unlock. Changes go through change orders.
- There's no lender approval step and no approval step for change orders.
- Open deviation flags always block locking.
- Lines with no rate, or with labor still awaiting a bid, block locking unless you mark them as an allowance or remove them.
- PDF export only works on a locked scope.
- Import is closed on a locked scope. Use a change order to add new lines.
- The Walkthrough tab in the builder is marked Soon and shows a Coming Soon page.